Photovoltaic






Prima... Prima...

Photovoltaic installation Project

The plant realized is a grid-connected type, destinated to work in parallel to the internal electric net and therefore to the national electric net. The power put in is of 148.5kWp and provides energy to cover the 15% of the annual Mollfam electricity requirements.

The energy produced in excess goes to the national net.
The plant roof area, realized in eternit, has been today cleared up and remade using isolating sandwich panels of the 200mm thick and units FV in configuration of a total architectural integration. This is to obtain the maximum incentive rate comprehensive of the additional prize of 5% due to the asbestos clearance.


Photovoltaic installation data:
Power installed: 148.5 kWp
Production expected: 150 MWh/year
Avoid carbon emissions in atmosphere: 80 ton/year
Inverter: Power One PVI central 165
Temposolar panels TS-AUR
Number of units installed: 1182
Design and supervision EnergyProject S.p.A.
Construction work and lay of panels implementation www.CLFitalia.it
Electric work realization www.parpanesi.it